In this technique, a circular hole is excavated up to the depth at which the soil will stand unsupported (about 0.5m for tender clay and 2m for stiff clay). Vertical boards called laggings, are then set in posture around the excavated deal with and they are held tightly against the https://amazondeliveryhours22110.blog-a-story.com/10989403/not-known-facts-about-pile-foundation-services-bangladesh